BELLOWS ARCHITECTS

Construction

PARTS OF BUILDINGS WE HAVE DESIGNED AND BUILT
 
 
1WP2014.jpg 

 
This replacement stair was re-built to be safer by making it longer.  

1WP20150704132218Pro.jpg
 
The problem 
 
1WP20150713093717Pro.jpg
 
 
Making this duct disappear required a skin that was thin-- ceiling clearances were very tight, and could take paint well.  
 
Above: plywood frame 'hung' from joists, above duct. 
 
 
14Pro.jpg
 
New Lintel blending in with door and trim 
 
 

 By pre-cutting the existing ceiling joists before sheetrocking, the shallow vaulted space (painted white) added extra inches to low clearance shower.
 
2WPPro.jpg 

 

 

 

 

 The office taking shape.

 

20-DSC05448.jpg 

 

 

The 'guts' beneath the finished window. 

 

1058.JPG 

 

Office and door into bathroom.

 

12Pro.jpg 

Enter supporting content here

Architecture    www.architecturebyjeff.com
518-392-0084